A niche blog dedicated to the issues that arise when supplementary protection certificates (SPCs) extend patents beyond their normal life -- and to the respective positions of patent owners, investors, competitors and consumers. The blog also addresses wider issues that may be of interest or use to those involved in the extension of patent rights. You can email The SPC Blog here

Showing posts with label article 3(b). Show all posts
Showing posts with label article 3(b). Show all posts

Thursday, 23 March 2017

Atripla - a combination of issues

Mr Justice Arnold gave his ruling earlier this week in Teva UK Limited & Ors v Merck Sharp & Dohme Corporation [2017] EWHC 539 (Pat).

In brief, Merck Sharp & Dohme (MSD) was granted an SPC for a combination product of  efavirenz, emtricitabine and tenofovir disoproxil fumarate based on EP (UK) 0 582 455 (the product is marketed as Atripla by Bristol-Myers Squibb Co. and Gilead Sciences Inc).  At trial, MSD relied on claim 16 as protecting the product.  Claim 16 reads:
“A combination of the compound of claim 12 or a pharmaceutically acceptable salt thereof with a nucleoside analog having biological activity against HIV reverse transcriptase.”
MSD also previously obtained an SPC for efavirenz based on the same patent.  Teva, Accord and Mylan challenged the validity of the SPC.

Mr Justice Arnold found that the SPC was invalid because it did not comply with either Article 3(a) or Article 3(c) of the SPC Regulation.  More specifically, he found that the scope of protection of claim 16 extended to a combination of efavirenz and tenofovir or a combination of efavirenz and emtricitabine, but not to a combination of all three actives.  He also found that the SPC does not comply with Article 3(c) because claim 16 does not represent a distinct invention from the invention protected by the claims for efavirenz.

Monday, 1 August 2016

New referral to the CJEU

In Merck Sharp & Dohme v Comptroller-General of Patents [2016] EWHC 1896 (an appeal to BL O/117/16), Mr Justice Arnold has referred the following questions to the CJEU for a preliminary ruling:

(1) Is an end of procedure notice issued by the reference member state under Article 28(4) of the Medicinal Products Directive equivalent to a granted marketing authorisation for the purposes of Article 3(b) of the SPC Regulation?

(2) If the answer to question (1) is no, is the absence of a granted marketing authorisation at the date of the application for a certificate an irregularity which can be cured under Article 10(3) of the SPC Regulation once the marketing authorisation has been granted?

This case arose because Merck Sharp & Dohme filed an SPC application one day before patent expiry but only had the "End of Procedure Communication" but not a marketing authorisation.